Lean Store Deployment in Belgrade for optimising ordering process and controlling shrinkage

Sivaram was in Belgrade, Serbia between 6’th to 14’th February 2017 for a scoping assignment to plan for Lean Store Deployment initiative to start in one of the large B2B retail mega stores in Belgrade. The scoping exercise involves improving the ordering process driven out of store departments and optimising the stock days and shrinkage basis sales trends and forecasts.

Annual RAMS 2017 Conference in Florida, U.S.A between 23’rd to 25’th Jan 2017

Thimmiah Gurunatha has participated in the 63’rd Annual Reliability and Maintainability Symposium and interacted with reliability professionals and delegates from around the world held between 23’rd and 25’th January 2017. Thim presented the application of Rainbow SPC charts in improving various process parameters using the universal pre-control charts, attribute charts and reliability charts to monitor and[…]

ASQ Annual LMC Conference in Ahmedabad on Lean Imperatives for Indian industry

Sivaram Pandravada and Roshan D Souza participated in the ASQ Annual LMC conference in Ahmedabad on 26’th and 27’th November 2016. EBITDA Solutions presented two case studies based on live projects within Retail domain using Rainbow SPC control charts to control shrinkage within fresh food division in a large retail store chain and for optimising stock days within[…]